地铁建设进入铺轨阶段,轨道专业与土建、通信、信号、供电与风水电安装等多专业均存在平行或交叉施工。根据地铁铺轨的系统性特点和多专业施工配合需求,提前预测施工过程中出现的专业接口和交叉界面,制定接口管理和交叉施工预防措施,协同各专业间加强计划统筹和相互配合,为持续推进铺轨创造必要施工条件。
When metro construction has entered a stage of track laying, track and other different works including civil engineering, communications, signaling, power supply and installation of ventilate and water supply have parallel interference or crossover interference during the construction. Based on the systemic features of metro track laying construction and requirements of multi-specialty construction for coordination, it is very necessary to predict in advance different works interface and cross interface to regulate interface management and work out cross-construction precautions. To collaborate and cooperate with each other to improve overall plan, it serves the goal of continuous advance and provides necessary conditions for track laying construction.