In the design of the current domestic industrial water supply,the most commonly used way to deal with water pressure shortage is to build pump station together with suction sump water supply. Though,such method tends to be safe,the costs of operation and management are greater. This study combined with the requirements of Hengquan Reservoir water supply pumping station and on the basis of successful optimization design research,put forward a method which was adding pump to water pipe directly without suction sump and regulating valve. In order to reduce investment,make management convenient and make full use of residual velocity head,small flow was transported by gravi-ty,only over flow was pumped up by the pump station,and pumps adopting variable frequency regulation and increasing the water velocity gradually. Air release valves were set along the pipes to avoid vacuum condition,which would lead to pipe explosion. According to the field test of the completed 38km pipeline r